Colledge Road Croydon
Project
Colledge Road Croydon
CLIENT
Tide Construction
VALUE
£7.5m
DATE
Completed – Dec 21
Works Undertaken - Basement, 2 x cores Slipform 50 & 35 floors plus suspended slabs up to transfer level at level 4. At 50 storeys, the tallest modular building in Europe includes 817 BTR
one-bed and studio apartments. At a 163 metres in height, College Road has become the tallest volumetric modular building in Europe.
Back to projects
"What I found with OBR is that you get a subcontractor proud and confident in their ability & skill but also willing to come to the table when issues arise such a value engineering requirements and other project challenges."
John O Dwyer, Tide Construction
21st March, 2014
John O Dwyer, Tide Construction
OBR’s approach to completing the sub/superstructure scope on my project was consistent – safety, program, achievable task deliverables & quality. From the outset of the project the level of commitment and real project engagement was demonstrable. Experience is key to RC frame project success and OBR certainly proved their worth in that regard. What I found with OBR is that you get a subcontractor proud and confident in their ability & skill but also willing to come to the table when issues arise such a value engineering requirements and other project challenges. Quality was unsurpassed and at closeout stage the result was a project built to specification, on time and on budget.