UK Office:
+44 (0) 1494211846
info@obrgroup.co.uk

Irish Office:
+353 (0)21 4826 340
info@obrgroup.ie

28
years
in business

Reinforced Concrete Frame

We are Leaders in High Rise Concrete Frames and groundworks and have a strong reputation for delivery in residential, Commercial, hospitality and Civils sectors.

As a key part of the business, we have capacity to undertake reinforcement structures ranging from a single podium through to tower blocks across the United Kingdom
•    Traditional RC Frames
•    Formwork Systems
•    Falsework Systems
•    Slipform Cores
•    Jump form Cores
•    Precast Concrete
•    Post – Tensioning
•    Pre-cast & Concrete Staircases

View our works: Castle Park View

 

"OBR Construction carried out the groundworks and 3 storey RC Frame including supply of the tower carne for Clegg Construction at Peterborough College. OBR carried out their works safely ahead of programme, on budget and to a high standard of quality. They managed their works professionally especially where logistics was a challenge working around in a live College environment."

Rodger Bancroft- Senior Project Manager, Clegg Construction
21st March, 2014

Read full testimonial
Peterborough College Project

OBR Construction carried out the groundworks and 3 storey RC Frame including supply of the tower carne for Clegg Construction at Peterborough College. OBR carried out their works safely ahead of programme, on budget and to a high standard of quality. They managed their works professionally especially where logistics was a challenge working around in a live College environment. • OBR managed commercial aspects in an ordered, non-confrontational and professional manner. • OBR took a very proactive approach in resolving any site or design issues. • OBR very self-contained in that they do not require a great deal of supervision from main contractor to ensure works proceed safely and to programme. • OBR works well with the main contractor to ensure minimal disruption to the day-to-day activities of the college on a busy campus location. • OBR ensure quality of works as the progress resulting in very few snagging issues which were dealt with very promptly when raised. I would certainly engage with OBR on future projects.