What Our Clients Say

OBR Construction is trusted by Tier 1 contractors to deliver complex reinforced concrete, substructure, and superstructure works across a wide range of sectors. Our clients consistently recognise our commitment to safety, programme certainty, quality, and collaborative delivery.

The testimonials below reflect long-standing client relationships and repeat appointments, highlighting OBR’s proactive approach, minimal supervision requirements, and ability to perform in live environments and logistically constrained sites.




As a client for nearly a decade, I have had the pleasure of working with OBR Construction across various projects throughout the UK.

OBR consistently demonstrates excellence in programme management, ensuring that all projects are delivered on time and to the highest quality standards. Their commitment to health and safety is exemplary, sites are always presented tidy and well managed, promoting a positive culture throughout the business.

In every collaboration, OBR have delivered first-class results, and their professionalism and dedication have made them a trusted partner.


Alex Reynolds, Regional Director
Bowmer + Kirkland

 



OBR delivered their works safely, ahead of programme, on budget, and to a high standard of quality. They managed their works professionally, particularly where logistics were challenging within a live college environment.

OBR managed commercial aspects in an ordered, non-confrontational manner and took a proactive approach to resolving site and design issues. They were very self-contained, requiring minimal supervision from the main contractor, and worked collaboratively to ensure minimal disruption to day-to-day college activities.

Quality was maintained throughout the works, resulting in very few snagging issues, all of which were dealt with promptly when raised. I would certainly engage with OBR on future projects.

Rodger Bancroft
Senior Project Manager, Clegg Construction

LEARN MORE: Peterborough College,Peterborough

 



OBR have completed numerous contracts for me over the years and were best placed to undertake the in-situ frame with transfer slab for the new Clayton Hotel in Manchester, including all substructure and basement works. Health and safety is key to any project’s success, and OBR excel with a zero-tolerance approach to poor health and safety behaviour, site attitude, and housekeeping, giving confidence that you are in safe hands.

OBR have consistently impressed me with their work ethic and managerial approach, going the extra mile to deliver successful projects that are built to a high standard of finish, within cost plans, and to the agreed programme.

Paul Holt
Senior Projects Manager, Bowmer + Kirkland

LEARN MORE: Clayton Hotel, Manchester

 



Bouygues UK engaged OBR Group for the construction of the RC frame on the iconic Castle Park View development in the centre of Bristol. The 26-storey tower, along with four lower-level blocks, has become the tallest building in Bristol, surpassing the historic St Mary Redcliffe constructed over 500 years ago.

OBR’s team were dynamic in their approach, preferring to slipform each of the four cores. The tower core was successfully slipped in seven weeks and quickly became a new landmark on Bristol’s skyline. By working closely together, the works were completed to a high quality and ahead of programme, despite the impacts and site closures associated with Covid-19.

I would have no hesitation in working with OBR again in the future.

Tony Rides
Project Director, Bouygues UK

LEARN MORE: Castle Park View, Bristol

 



The scope of works on the Runcorn Thermal Power Station project included complex substructure and superstructure elements, including the Waste Bunker, with certain walls approaching 50m in height. The execution of the works involved significant temporary works design, which OBR managed diligently.

OBR delivered on safety, quality, and schedule on what we would regard as a technically challenging project. The personal commitment of their senior management was a significant factor in this success. A key factor in selecting OBR for this project was their capacity to deliver. OBR have executed projects for Sisk since 2000, and I have personal experience of working with them on a number of projects dating back to that time.

I would consider OBR for any reinforced concrete works in the future and would have no hesitation in recommending them.

Tom Wall
Construction Director, John Sisk & Son Ltd


LEARN MORE: Runcorn Thermal Power Station

 



OBR formed the core, ground floor transfer slab, and other ancillary concrete works on a fifteen-storey office project in Coventry city centre between 2021 and 2022. OBR executed the works to a very tight programme and were proactive throughout, with a strong eye for quality and detailing on the project. OBR were extremely user-friendly, and I could not recommend them more highly.

Paul Kelly
Senior Project Manager, Bowmer + Kirkland

 



OBR performed exceptionally on a programme-driven project with significant logistical challenges. Personally, I found that OBR’s experience was invaluable in helping us navigate what was, at times, an intensely challenging scheme, while achieving all milestone dates throughout the project.

I would have no reservations in recommending OBR and will seek to utilise them again on future RC projects.

James Minehan
Senior Project Manager, Tide Construction

 



OBR’s approach to completing the substructure and superstructure scope on my project was consistent, focusing on safety, programme, achievable task deliverables, and quality. From the outset, the level of commitment and genuine project engagement was clearly demonstrated. Experience is key to RC frame project success, and OBR certainly proved their worth in that regard.

What I found with OBR is that you get a subcontractor who is proud and confident in their ability and skill, while also willing to come to the table when issues arise, such as value engineering requirements and other project challenges.

Quality was unsurpassed, and at closeout stage the result was a project built to specification, on time, and on budget.

John O’Dwyer
Tide Construction

 



Whilst working with OBR on our first scheme together at Plot E2, Media City (Manchester), I have been impressed from a commercial perspective throughout the procurement, construction, and post-contract stages of the project, and would not hesitate to continue our relationship on future schemes.

David White
Project Quantity Surveyor, Bowmer + Kirkland

LEARN MORE: Media City, Manchester

"What I found with OBR is that you get a subcontractor proud and confident in their ability & skill but also willing to come to the table when issues arise such a value engineering requirements and other project challenges."

John O Dwyer, Tide Construction

Read full testimonial
John O Dwyer, Tide Construction

OBR’s approach to completing the sub/superstructure scope on my project was consistent – safety, program, achievable task deliverables & quality. From the outset of the project the level of commitment and real project engagement was demonstrable. Experience is key to RC frame project success and OBR certainly proved their worth in that regard. What I found with OBR is that you get a subcontractor proud and confident in their ability & skill but also willing to come to the table when issues arise such a value engineering requirements and other project challenges. Quality was unsurpassed and at closeout stage the result was a project built to specification, on time and on budget.