Peterborough College, Peterborough

Project
Peterborough College, Peterborough

CLIENT
Clegg Construction

VALUE
£1.8m

DATE
Completed – May 2024

OBR Construction delivered the reinforced concrete frame and groundworks for the Centre for Green Technology at Peterborough College in Peterborough. The three storey building sits on the college's main campus off Park Crescent and was designed to prepare future generations for careers in sustainability and green technology.


Back to projects

 

"OBR Construction carried out the groundworks and 3 storey RC Frame including supply of the tower carne for Clegg Construction at Peterborough College. OBR carried out their works safely ahead of programme, on budget and to a high standard of quality. They managed their works professionally especially where logistics was a challenge working around in a live College environment."

Rodger Bancroft- Senior Project Manager, Clegg Construction

Read full testimonial
Peterborough College Project

OBR Construction carried out the groundworks and 3 storey RC Frame including supply of the tower carne for Clegg Construction at Peterborough College. OBR carried out their works safely ahead of programme, on budget and to a high standard of quality. They managed their works professionally especially where logistics was a challenge working around in a live College environment. • OBR managed commercial aspects in an ordered, non-confrontational and professional manner. • OBR took a very proactive approach in resolving any site or design issues. • OBR very self-contained in that they do not require a great deal of supervision from main contractor to ensure works proceed safely and to programme. • OBR works well with the main contractor to ensure minimal disruption to the day-to-day activities of the college on a busy campus location. • OBR ensure quality of works as the progress resulting in very few snagging issues which were dealt with very promptly when raised. I would certainly engage with OBR on future projects.