years
in business
Environmental Policy
The Directors of OBR are committed to continual improvement of their Environmental Management System to protect the natural environment and control pollution.
The company recognises that desired environmental standards are only achievable with the help of a skilled and motivated workforce.
The company will:
• Ensure we conduct our business in a manner that conserves the environment, minimises pollution and reduces our carbon footprint.
- We achieve this by using cement replacement GGBS or Fly ash in concrete wherever practical.
- Reduce the number of weekly deliveries to every site and order in Bulk
• Comply with the Environmental Protection Act 1990 and associated regulations and approved codes of practice.
• Commit to the prevention of pollution and protecting the environment by striving to prevent and minimise our contribution to pollution of land, air, and water.
• Introduce the use of space for segregation and storage of waste during the life of projects and measured term contracts.
• Support the use of reclaimed materials and selection of environmentally preferable materials in accordance with good practice guidance.
• Consider end of life re-cycling options for all construction materials.
• Conserving water resources through designing for increased water efficiency in larger building projects. Monitor the use of water conservation at HQ.
• Continually strive to improve and review objective and targets annually.
• Communicate the policy to all staff and relevant stakeholders and sub-contractors and enhance awareness through training programmes.
The policy statement will be regularly reviewed, updated as necessary and discussed at the company’s annual review. The directors endorse this policy statement and are fully committed to the implementation of the policy and to comply with all regulatory requirements.
March 2022
Mike O’Sullivan
"OBR Construction carried out the groundworks and 3 storey RC Frame including supply of the tower carne for Clegg Construction at Peterborough College. OBR carried out their works safely ahead of programme, on budget and to a high standard of quality. They managed their works professionally especially where logistics was a challenge working around in a live College environment."
Rodger Bancroft- Senior Project Manager, Clegg Construction
Peterborough College Project
OBR Construction carried out the groundworks and 3 storey RC Frame including supply of the tower carne for Clegg Construction at Peterborough College. OBR carried out their works safely ahead of programme, on budget and to a high standard of quality. They managed their works professionally especially where logistics was a challenge working around in a live College environment. • OBR managed commercial aspects in an ordered, non-confrontational and professional manner. • OBR took a very proactive approach in resolving any site or design issues. • OBR very self-contained in that they do not require a great deal of supervision from main contractor to ensure works proceed safely and to programme. • OBR works well with the main contractor to ensure minimal disruption to the day-to-day activities of the college on a busy campus location. • OBR ensure quality of works as the progress resulting in very few snagging issues which were dealt with very promptly when raised. I would certainly engage with OBR on future projects.
