St. Michaels Phase 1, Manchester

Project
St. Michaels Phase 1, Manchester

CLIENT
Bowmer & Kirkland

VALUE
£9.6m

DATE
Due for Completion Feb 24

Works Undertaken - OBR Construction Limited have been awarded the RC Frame on phase 1 St. Michaels. The core was one of the largest slipform’s completed by OBR. Following completion of the slip ahead of programme OBR are currently completing the 11 floor RC frame. The slabs are all a Post tensioned design.

When complete the scheme will deliver 185,000 sq ft of prime Grade A office accommodation across all floors.

 
 
 


Back to projects
Services:

 

"OBR performed exceptionally on what was a programme driven project with significant logistical challenges. "

James Minehan, Project Director, Tide Construction
21st March, 2014

Read full testimonial
James Minehan, Tide Construction

OBR performed exceptionally on what was a programme driven project with significant logistical challenges. Personally, I found that OBR’s experience excelled and helped us navigate through what was at times an intensely difficult and challenging scheme, achieving all milestone dates throughout the project. I would have no reservations in terms of recommending OBR and will seek to utilise them again on future RC projects.