UK Office:
+44 (0) 1494211846
info@obrgroup.co.uk

Irish Office:
+353 (0)21 4826 340
info@obrgroup.ie

29
years
in business

Greenford Block 8, London

Project
Greenford Block 8, London

CLIENT
Tide Construction

VALUE
£7.0m

DATE
Completed - May 23

Works Undertaken - OBR Construction delivered the enabling works and full groundworks package, including underground drainage, utilities, waterproofing and foundations. This was followed by an RC frame with six cores ranging from 7-15 storeys, delivered using slipform construction.

 

 


Back to projects

 

"OBR performed exceptionally on what was a programme driven project with significant logistical challenges. "

James Minehan, Project Director, Tide Construction

Read full testimonial
James Minehan, Tide Construction

OBR performed exceptionally on what was a programme driven project with significant logistical challenges. Personally, I found that OBR’s experience excelled and helped us navigate through what was at times an intensely difficult and challenging scheme, achieving all milestone dates throughout the project. I would have no reservations in terms of recommending OBR and will seek to utilise them again on future RC projects.