Guildford Plaza – Guildford

Project
Guildford Plaza – Guildford

CLIENT
CField Construction

VALUE
£8m

DATE
Commenced Oct 23 – Completed September 24

OBR Construction were contracted to complete the Enabling, Groundworks, Basement and RC Frame Construction of 4no Blocks. Each Block Ranges from 3 Storeys and 7 Storeys.

Initially being Principal contractor on the project overseeing the Enabling and Groundworks, OBR delivered several blocks ahead of programme for our client who took on PC Role in March 24.

With close co-ordination with our client allowed OBR to complete the RC Frames ahead of programme on a logistically challenging project.


Back to projects

 

"OBR Construction carried out the groundworks and 3 storey RC Frame including supply of the tower carne for Clegg Construction at Peterborough College. OBR carried out their works safely ahead of programme, on budget and to a high standard of quality. They managed their works professionally especially where logistics was a challenge working around in a live College environment."

Rodger Bancroft- Senior Project Manager, Clegg Construction
21st March, 2014

Read full testimonial
Peterborough College Project

OBR Construction carried out the groundworks and 3 storey RC Frame including supply of the tower carne for Clegg Construction at Peterborough College. OBR carried out their works safely ahead of programme, on budget and to a high standard of quality. They managed their works professionally especially where logistics was a challenge working around in a live College environment. • OBR managed commercial aspects in an ordered, non-confrontational and professional manner. • OBR took a very proactive approach in resolving any site or design issues. • OBR very self-contained in that they do not require a great deal of supervision from main contractor to ensure works proceed safely and to programme. • OBR works well with the main contractor to ensure minimal disruption to the day-to-day activities of the college on a busy campus location. • OBR ensure quality of works as the progress resulting in very few snagging issues which were dealt with very promptly when raised. I would certainly engage with OBR on future projects.