£4.5m

DATE
Aug 22 - July 23

Works Undertaken - Basement and RC Frame. 8 floors RC frame with 3 no. cores. Due to location and weather conditions through winter months OBR slip formed 2 of the 3 cores and utilized Precast columns, skydecking for formwork to slabs and Bamtec rollout reinforcement.

 

 

 


Back to projects

 

"OBR performed exceptionally on what was a programme driven project with significant logistical challenges. "

James Minehan, Project Director, Tide Construction
21st March, 2014

Read full testimonial
James Minehan, Tide Construction

OBR performed exceptionally on what was a programme driven project with significant logistical challenges. Personally, I found that OBR’s experience excelled and helped us navigate through what was at times an intensely difficult and challenging scheme, achieving all milestone dates throughout the project. I would have no reservations in terms of recommending OBR and will seek to utilise them again on future RC projects.

© OBR Construction Ltd. All rights reserved.
Site development orpendesignsolutions.com.