UK Office:
+44 (0) 1494211846
info@obrgroup.co.uk

Irish Office:
+353 (0)21 4826 340
info@obrgroup.ie

27
years
in business

New Road Triangle Feltham, London

Project
New Road Triangle Feltham, London

CLIENT
CField Construction

VALUE
£5.6m

DATE
Completed - June 23

Works Undertaken - OBR Construction Limited have completed the Enabling Works, all aspects of Groundworks including underground drainage, underground services, gas & waterproof membrane, foundations and 2 x RC Frames 14

& 11 Storeys which included 2 x cores using Slipform Construction for our valued client CField Construction.

 
 
 


Back to projects

 

"OBR performed exceptionally on what was a programme driven project with significant logistical challenges. "

James Minehan, Project Director, Tide Construction
21st March, 2014

Read full testimonial
James Minehan, Tide Construction

OBR performed exceptionally on what was a programme driven project with significant logistical challenges. Personally, I found that OBR’s experience excelled and helped us navigate through what was at times an intensely difficult and challenging scheme, achieving all milestone dates throughout the project. I would have no reservations in terms of recommending OBR and will seek to utilise them again on future RC projects.

© OBR Construction Ltd. All rights reserved.
Site development orpendesignsolutions.com.