years
in business
Rope Walk, Blackrock, Cork
Project
Rope Walk, Blackrock, Cork
CLIENT
OBR Developments
DATE
30 September 2015
OBR Developments have completed 8 nr 3 bed semi detached houses in the highly sought after area of Blackrock. High quality finish both internally and externally achieving high BER Rating. Off street parking provided for all houses.
Back to projects
"OBR Construction carried out the groundworks and 3 storey RC Frame including supply of the tower carne for Clegg Construction at Peterborough College. OBR carried out their works safely ahead of programme, on budget and to a high standard of quality. They managed their works professionally especially where logistics was a challenge working around in a live College environment."
Rodger Bancroft- Senior Project Manager, Clegg Construction
Peterborough College Project
OBR Construction carried out the groundworks and 3 storey RC Frame including supply of the tower carne for Clegg Construction at Peterborough College. OBR carried out their works safely ahead of programme, on budget and to a high standard of quality. They managed their works professionally especially where logistics was a challenge working around in a live College environment. • OBR managed commercial aspects in an ordered, non-confrontational and professional manner. • OBR took a very proactive approach in resolving any site or design issues. • OBR very self-contained in that they do not require a great deal of supervision from main contractor to ensure works proceed safely and to programme. • OBR works well with the main contractor to ensure minimal disruption to the day-to-day activities of the college on a busy campus location. • OBR ensure quality of works as the progress resulting in very few snagging issues which were dealt with very promptly when raised. I would certainly engage with OBR on future projects.