years
in business
Tariff Street Manchester
Project
Tariff Street Manchester
CLIENT
United Living
VALUE
£10m
DATE
Completed –Jun 25
OBR Construction ltd carried out the Basement, groundworks and 2 RC frames for a new Client United Living. We provided 2 x tower cranes for the duration of our works and handed over one crane to United Living for there use once our works were completed.
The development consists of two new-build 10 and 12-storey apartment blocks, providing a mix of one-, two- and three-bedroom apartments with private gardens, roof terraces and rooftop amenities. The development will also provide two commercial units on the ground floor.
Back to projects
"OBR Construction carried out the groundworks and 3 storey RC Frame including supply of the tower carne for Clegg Construction at Peterborough College. OBR carried out their works safely ahead of programme, on budget and to a high standard of quality. They managed their works professionally especially where logistics was a challenge working around in a live College environment."
Rodger Bancroft- Senior Project Manager, Clegg Construction
Peterborough College Project
OBR Construction carried out the groundworks and 3 storey RC Frame including supply of the tower carne for Clegg Construction at Peterborough College. OBR carried out their works safely ahead of programme, on budget and to a high standard of quality. They managed their works professionally especially where logistics was a challenge working around in a live College environment. • OBR managed commercial aspects in an ordered, non-confrontational and professional manner. • OBR took a very proactive approach in resolving any site or design issues. • OBR very self-contained in that they do not require a great deal of supervision from main contractor to ensure works proceed safely and to programme. • OBR works well with the main contractor to ensure minimal disruption to the day-to-day activities of the college on a busy campus location. • OBR ensure quality of works as the progress resulting in very few snagging issues which were dealt with very promptly when raised. I would certainly engage with OBR on future projects.
